1 |
Many ebuilds fail due to failed QA. How difficult would it be to have |
2 |
the package create the tarball before the QA tests. If this were |
3 |
possible, QA could be slightly quicker, as there would be no need to |
4 |
rebuild the entire package, with features disabled, upon failure. |
5 |
|
6 |
-- |
7 |
Lares Moreau <lares.moreau@×××××.com> | LRU: 400755 http://counter.li.org |
8 |
lares/irc.freenode.net | |
9 |
Gentoo x86 Arch Tester | ::0 Alberta, Canada |
10 |
Public Key: 0D46BB6E @ subkeys.pgp.net | Encrypted Mail Preferred |
11 |
Key fingerprint = 0CA3 E40D F897 7709 3628 C5D4 7D94 483E 0D46 BB6E |