1 |
On Sat, Mar 12, 2022 at 12:29:22PM -0800, Matt Turner wrote: |
2 |
> Dear everyone, |
3 |
> |
4 |
> Here's the agenda for the upcoming council meeting, 2022-03-13 19:00 |
5 |
> UTC in the #gentoo-council channel. Apologies for the late |
6 |
> announcement. Events in the real world have necessitated a change of |
7 |
> chair for this meeting. Fortunately there were not really many |
8 |
> proposed topics. |
9 |
> |
10 |
> 1) Roll call |
11 |
> 2) Open bugs with Council participation |
12 |
> 3) Open floor |
13 |
I apologize for the late addition, but based on real-world interrupts |
14 |
and non-responses from Vendors, I was initially going to slip and |
15 |
present the final infra server request at the next meeting. |
16 |
|
17 |
However this past week it looks like there have been more drive failures |
18 |
in the existing stuff (including one of the SSDs in ovenbird.gentoo.org |
19 |
late Saturday night), and I think I've given the vendor contacts enough |
20 |
time, so I'd like to just move ahead anyway. |
21 |
|
22 |
The final server quote is here: |
23 |
https://dev.gentoo.org/~robbat2/20220312-infrastructure-server-thinkmate-RAX-QN10-21E2.pdf |
24 |
Coming in at $25,505 USD/ea before taxes & shipping. |
25 |
Does not include any discounts either, which I'm hoping that ThinkMate |
26 |
might provide us. |
27 |
|
28 |
It includes 3x TLC NVME drives, when I was trying to get QLC drives |
29 |
before to save money. However the price of QLC drives has increased to |
30 |
the point where it's now $1899/ea for the 7.68TB TLC drives vs $1843/ea |
31 |
for QLC. |
32 |
|
33 |
- 2x AMD EPYC 7543 CPUs, 32-core/64-thread each. |
34 |
- 1TB of RAM |
35 |
- 1x512GB OS NVME |
36 |
- 3x7.68TB DATA NVME |
37 |
- 2x25Gbit networking (and onboard 2x1Gbit) |
38 |
|
39 |
Future expansion room: |
40 |
- could double the RAM |
41 |
- could add another 7x NVME |
42 |
- PCIe slot available |
43 |
|
44 |
OS will be RAIDed onto the data NVMEs as well (this is where the Dell |
45 |
offering was good for RAID1 OS disks, but Dell was twice the price |
46 |
overall). |
47 |
|
48 |
Power consumption is not on the PDF, but the website tooling estimates a |
49 |
peak of 700W (of which 450W is the CPU at peak). |
50 |
|
51 |
The Foundation would purchase 2 of these machines to start with, with |
52 |
the third as a potential option as needed and subject to the CPA advice. |
53 |
|
54 |
-- |
55 |
Robin Hugh Johnson |
56 |
Gentoo Linux: Dev, Infra Lead, Foundation Treasurer |
57 |
E-Mail : robbat2@g.o |
58 |
GnuPG FP : 11ACBA4F 4778E3F6 E4EDF38E B27B944E 34884E85 |
59 |
GnuPG FP : 7D0B3CEB E9B85B1F 825BCECF EE05E6F6 A48F6136 |