1 |
On Thu, 2004-05-13 at 09:38, Chris Gianelloni wrote: |
2 |
|
3 |
> Does this mean a new version of catalyst will be put into portage for |
4 |
> the release? How soon before we can expect it? Does this mean there |
5 |
> will be a push to stabilize the 1.9.0 version of baselayout? |
6 |
> |
7 |
|
8 |
Yes, yes, and yes :) As soon as I add some more fixes and enhancements |
9 |
to Catalyst (including your X runscripts) I will be commiting a final |
10 |
version. Expect this to take until the end of next week or so. Once I |
11 |
commit (probably Catalyst 1.0.8), I would like to use that Portage |
12 |
version for release building (please do not use CVS as it changes too |
13 |
much). I promised various arches that I would not change Catalyst |
14 |
anymore when I release the Portage release version ;) I will update you |
15 |
all as more comes. As for baselayout, yup, agriffis is working on |
16 |
getting it stable. I want to have 1.9.0/1 used for the release as well. |
17 |
|
18 |
> |
19 |
> I know that we had deferred the X LiveCD to 2004.3, but I think we |
20 |
> should at least work to get a working .spec/template available in |
21 |
> catalyst. I have a working one for x86. |
22 |
|
23 |
Yup, see above. When I finish working on Catalyst for .2 (which will eat |
24 |
most of my time), I will start work on that. Thankfully X LiveCDs aren't |
25 |
too rough to get working. |
26 |
|
27 |
What we do need ASAP is that livecd herd. Is there anyone that can do |
28 |
this for us, or should I talk to devrel to drag someone in? ;) I would |
29 |
rather have someone on the team do it initially though due to time |
30 |
restraints. |
31 |
|
32 |
Cheers, |
33 |
//zhen |
34 |
-- |
35 |
John Davis |
36 |
Gentoo Linux Developer |
37 |
<http://dev.gentoo.org/~zhen> |
38 |
|
39 |
---- |
40 |
GnuPG Public Key: <http://dev.gentoo.org/~zhen/zhen_pub.asc> |
41 |
Fingerprint: 2364 71BD 4BC2 705D F338 FF70 6650 1235 1946 2D47 |