1 |
Anthony G. Basile: |
2 |
> |
3 |
> I'd like to add a discussion on glep 39. In particular, under |
4 |
> specifications we have: |
5 |
> |
6 |
> "It may have one or many leads, and the leads are selected by the |
7 |
> members of the project. This selection must occur at least once every 12 |
8 |
> months, and may occur at any time." |
9 |
> |
10 |
|
11 |
That requirement imposes a specific structure on projects. There are |
12 |
ways to have a functional project without any lead. |
13 |
|
14 |
So that phrase should be removed altogether. |
15 |
|
16 |
Instead, we need a functional ComRel project and need to stop treating |
17 |
some developers differently, because we do. |
18 |
|
19 |
And this is not really a specification problem (not saying you said that). |