1 |
>>>>> On Sat, 15 Aug 2015, Paweł Hajdan, wrote: |
2 |
|
3 |
> Nothing seems to prevent doing the mass conversion first, |
4 |
> deprecating EAPI 4, and then having a second, slower pass to make |
5 |
> sure the ebuilds are using EAPI 5 as they should be. One way might |
6 |
> be to add a "TODO" comment during mass conversion, which then can be |
7 |
> grepped for (and removed after manual review). |
8 |
|
9 |
How about a line like "EAPI=4" which can be grepped for? :) |
10 |
Seriously, what would be the benefit of a conversion if you need a |
11 |
second pass to redo it properly? |
12 |
|
13 |
Also there are still some 5000 ebuilds (14 %) with EAPIs 0, 1, 2, and |
14 |
3 in the tree. IMHO it would be better to spend our effort in updating |
15 |
those first. |
16 |
|
17 |
Ulrich |