On Monday 15 January 2007 02:36, Boyd Stephen Smith Jr. wrote: |
2 |
> > I've been taking a look at the script. I wonder why using emerge --sync |
3 |
> > at the beginning and update-eix at the end instead of an eix-sync. |
4 |
> |
5 |
> I want the information returned by eix after the script completes to take |
6 |
> into account the package updates that may occur during the portage or |
7 |
> world updates. I also want those updates to take into account the most |
8 |
> recent portage tree. So, I need a sync operation before the updates and a |
9 |
> eix-update after them. Thus, I can't combine the two operations into a |
10 |
> single eix-sync. |
11 |
|
12 |
Hmm.. maybe you think eix behaves like esearch. eix always looks in the vdb so |
13 |
whether you run update-eix before or after an upgrade is irrelevant.. |